Lito Electrical provides full and partial HDB rewiring services across Singapore. We work on 3-room, 4-room and 5-room flats, executive apartments and executive maisonettes.
With more than 10 years of hands-on rewiring experience, our team handles complete new wiring for resale renovations, replacement of old wiring, additional electrical points and electrical-layout changes for newly collected flats.
Every quotation is itemised according to the type and quantity of electrical work required. This allows homeowners to understand the price of each socket, lighting point, appliance point and DB-related item before work begins.
A typical full HDB rewiring project requires approximately three working days for wiring installation, followed by around two working days for switches, sockets, lights and final installation.
Why homeowners choose Lito Electrical:
Send us your floor plan, required electrical-point quantities and renovation schedule for an itemised quotation.

HDB rewiring involves replacing, upgrading or extending the electrical wiring and points inside an HDB flat.
The work may include:
The required work depends on the flat’s existing wiring condition, renovation layout, appliances and number of electrical points.
A complete inspection should be carried out before deciding whether the property requires full or partial rewiring.
Full HDB Rewiring
Full rewiring may be suitable for an older resale flat, a major renovation or a property with wiring of an unknown or deteriorated condition.
The work normally involves replacing or installing wiring for multiple circuits throughout the flat. New socket, lighting, switch and appliance-point locations can also be planned according to the new renovation layout.
Partial HDB Rewiring
Partial rewiring may be suitable when the existing wiring remains usable but selected rooms, circuits or electrical points require upgrading.
Examples include:
Partial rewiring can reduce unnecessary work when the remaining wiring has been properly assessed and found suitable for continued use.

Newly Collected HDB Flats
Newly collected flats may not require complete rewiring, but homeowners often need additional electrical points or changes to the original layout.
Common requests include:
Planning these points before carpentry and renovation work helps reduce changes later.
A resale or older HDB flat may require partial or full rewiring depending on the wiring condition and renovation scope.
Older wiring should be assessed when:
Repeated power trips do not always mean that complete rewiring is required. The problem may come from an appliance, socket, circuit or DB component. Proper electrical checking should be carried out before recommending full rewiring.
Depending on the agreed quotation, our HDB rewiring services may include:
Hager or Schneider protection components are normally provided for DB, RCCB and MCB work, depending on availability and the agreed quotation.

Our rewiring quotations are itemised according to the number and type of electrical points required.
The prices below include standard electrical cable, PVC trunking, standard accessories and installation labour.
| Electrical service | Price |
| New light point | $45 per point |
| Install customer-supplied light | $15 each |
| New single power socket point | $60 per point |
| New double power socket point | $70 per point |
| New water-heater point | $220 per point |
| New air-conditioner point | $250 per point |
| HDB DB box replacement | $550 |
No GST is charged.
The final quotation depends on:
Customers will receive an itemised quotation showing the quantities and prices before work begins.

1. Send Us Your Floor Plan and Requirements
Send us the HDB floor plan, renovation layout or a list of the required electrical points.
Helpful information includes:
2. Electrical Layout and Quotation
We review the proposed electrical layout and prepare an itemised quotation based on the quantities and scope.
If the existing wiring condition is uncertain, an assessment may be recommended before confirming whether full or partial rewiring is more suitable.
3. Wiring Installation
For a typical full HDB rewiring project, the main wiring and trunking installation normally requires approximately three working days.
The schedule depends on the flat size, number of electrical points, wiring routes and coordination with other renovation work.
4. Final Electrical Installation
Lights, switches, sockets, ceiling fans and other final fittings are normally installed after the renovation work has reached the appropriate stage.
Final installation generally requires approximately two working days, depending on quantities and site readiness.
5. Circuit Checking and Handover
After installation, the electrical circuits and points are checked according to the agreed work scope.
The completed work is handed over together with the applicable warranty terms.
A typical complete HDB rewiring schedule is:
This is an estimated working schedule. More time may be required for larger flats, executive maisonettes, complex layouts or projects that need to be coordinated with carpentry, ceiling or other renovation work.
HDB homeowners should engage an EMA-licensed electrical worker for electrical work.
The precise permit, submission or testing requirements depend on the type of work, the flat’s electrical loading and the equipment being installed.
For example, HDB states that flats without higher electrical loading require an HDB permit when installing new 15A power points for air-conditioners or other higher-capacity appliances.
Homeowners should confirm the applicable requirements before work begins instead of assuming that every electrical alteration follows the same process.
Lito Electrical can assess the proposed work and advise whether additional approval, testing or coordination may be required.
EMA Licence No. 7/077235.
HDB advises homeowners to replace electrical wiring when its lifespan is over or when it has become worn out.
Signs that an electrical assessment may be needed include:
These signs do not automatically mean the entire flat needs rewiring. Electrical troubleshooting can help determine whether the problem is limited to an appliance, electrical point, circuit, DB component or a larger part of the wiring system.

Lito Electrical has more than 10 years of hands-on experience carrying out HDB wiring and rewiring work across Singapore.
We have completed numerous projects in:
Our experience covers 3-room, 4-room and 5-room flats, executive apartments and executive maisonettes.
We have completed full new electrical wiring for different types of HDB homes in Bedok.
The project scope may include:
Our team has also completed numerous HDB electrical projects in Hougang, Tampines and Ang Mo Kio.
These projects include complete new wiring during renovation, partial replacement of old wiring, additional electrical points and changes to existing electrical layouts.
Customers can send us their floor plan and required quantities before work starts. We will prepare an itemised quotation showing the price and quantity for each agreed item.
Our team has more than 10 years of hands-on experience with HDB wiring, rewiring and residential electrical installations.
We assess the project scope before recommending complete or selected rewiring work.
We work on 3-room, 4-room and 5-room flats, executive apartments and executive maisonettes.
Our quotations show the individual quantities and prices instead of providing an unclear package amount.
Hager or Schneider components are normally provided for DB, RCCB and MCB installations, depending on the agreed scope and availability.
Completed rewiring work comes with a one-year warranty, subject to the quotation terms and agreed scope.
We have completed HDB electrical projects in Bedok, Hougang, Tampines, Ang Mo Kio and other estates across Singapore.
To prepare an accurate quotation, send us:
If the quantities are not finalised, send us the floor plan first. We can review the layout and discuss the required electrical points.
The total cost depends on the type and quantity of electrical points, flat size, wiring routes, DB requirements and renovation scope. Lito Electrical provides an itemised quotation instead of using one fixed package price.
A typical project requires approximately three working days for wiring installation and another two working days for switches, sockets, lights and final installation. The actual schedule depends on the flat and renovation progress.
No. The existing wiring should be assessed first. Some flats may require full rewiring, while others may only require selected circuit replacement, additional points or partial rewiring.
HDB homeowners should engage an EMA-licensed electrical worker for electrical work. The specific permit, testing and submission requirements depend on the work scope and the flat’s electrical loading.
Yes. Additional socket, lighting, ceiling-fan and appliance points can be planned according to the renovation layout and household requirements.
Yes. The listed prices include standard cable, PVC trunking, standard accessories and installation labour. The final quotation remains subject to quantities, routing, site conditions and the agreed work scope.
We normally provide Hager or Schneider protection components, depending on the project requirements, agreed quotation and product availability.
Yes. Completed rewiring work comes with a one-year warranty, subject to the terms and scope stated in the quotation.
Send us your HDB floor plan, flat type, renovation layout, required electrical-point quantities, DB box photograph and preferred work schedule.
Planning full or partial HDB rewiring?
Send Lito Electrical your floor plan, electrical-point quantities and renovation requirements. We will review the project scope and prepare an itemised quotation.
More than 10 years of hands-on rewiring experience.
One-year warranty.
Projects completed across Singapore.